Use your brain to solve the water supply problem


Release time:

2016-10-20

On the morning of October 14, Zhen Jicai, deputy general manager of Xingguang Sugar Industry, found that the water supply pipeline from Dongjing to the business center under the south wall of the research and development center was damaged during an inspection in the factory area. Because the leakage point was under the corner of the wall and there were many leakage points, the leakage point could not be sealed by electric welding. In order not to affect the water consumption of the club, Zhen and master Zhang Guojun of sugar took people to deal with the pipeline problem. Zhen and Master Zhang came up with a good solution through on-the-spot inspection: Master Zhang Guojun led people to disconnect and seal the pipeline between Dongjing and the business club, and connected the club pipeline to the water pipeline of the national storage well for the community. In this way, difficult problems are solved. Although the working site environment is very poor, it is not easy to construct.

图片

On the morning of October 14, Zhen Jicai, deputy general manager of Xingguang Sugar Industry, found that the water supply pipeline from Dongjing to the business center under the south wall of the research and development center was damaged during an inspection in the factory area. Because the leakage point was under the corner of the wall and there were many leakage points, the leakage point could not be sealed by electric welding. In order not to affect the water consumption of the club, Zhen and master Zhang Guojun of sugar took people to deal with the pipeline problem. Zhen and Master Zhang came up with a good solution through on-the-spot inspection: Master Zhang Guojun led people to disconnect and seal the pipeline between Dongjing and the business club, and connected the club pipeline to the water pipeline of the national storage well for the community. In this way, difficult problems are solved. Although the working environment is very poor and it is not easy to construct, master Zhang took only half a day to complete the original work of one and a half days with the sugar workers, and delivered water to the business center in time.

Key words: