The preparation work before the innovation of thermal heating in winter


Release time:

2016-09-23

With the decrease of outdoor temperature, winter heating work has entered a tense preparation stage. The heating task is heavy, and the leaders of the heating company have made careful arrangements for the heating work in winter, leading front-line employees to prepare for the heating work in winter in advance. For the winter heating equipment to carry out thorough maintenance, to ensure that the heating equipment is in good condition, increase the inspection of each pipeline, to ensure the normal heating of Leling City on November 15, so that citizens have a warm winter. (1) Check the heating main pipe, water supply and return, valve, discharge, wave temperature tube and other accessories in the small room one by one, and find problems

图片

With the decrease of outdoor temperature, winter heating work has entered a tense preparation stage. The heating task is heavy, and the leaders of the heating company have made careful arrangements for the heating work in winter, leading front-line employees to prepare for the heating work in winter in advance.
For the winter heating equipment to carry out thorough maintenance, to ensure that the heating equipment is in good condition, increase the inspection of each pipeline, to ensure the normal heating of Leling City on November 15, so that citizens have a warm winter.
(1) Check the heating supervisor, water supply and return, valves, water discharge, wave temperature tube and other accessories in the small room one by one, and register and report any problems found. (2) Be familiar with and master heating pipelines and emergency escape skills. (3) The required accessories shall be planned in a timely manner and reported to the department in a timely manner. (4) Complete tools, equipment, protective equipment, measures and emergency plans.
In short, colleagues will do their best to prepare for heating in 2016 and strive to be an excellent pipe network operator.


Key words: