Skills Competition Leading Enterprise Production Innovation


Release time:

2016-06-14

In response to the requirements of the third "innovative" skills competition held by the group company and the innovation comprehensive project, director pan found the abandoned screw conveyor from the waste pile according to the actual work experience and technical level for many years, and formulated the design scheme of the screw conveyor and innovated the use mode. According to the precise calculation, accurate technical parameters are obtained. According to the technical parameters, the waste equipment is made into a mechanical and electrical movable screw conveyor with a length of 15 meters, a width of 0.5 meters, a pitch of 30 centimeters and a motor of 3 watts. Through the practical application of the equipment has strong practicability

图片

In response to the requirements of the third "innovative" skills competition held by the group company and the innovation comprehensive project, director pan found the abandoned screw conveyor from the waste pile according to the actual work experience and technical level for many years, and formulated the design scheme of the screw conveyor and innovated the use mode. According to the precise calculation, accurate technical parameters are obtained. According to the technical parameters, the waste equipment is made into a mechanical and electrical movable screw conveyor with a length of 15 meters, a width of 0.5 meters, a pitch of 30 centimeters and a motor of 3 watts.
Through practical application, the equipment has the advantages of strong practicability, high utilization rate, safety and reliability. And saved a lot of money for the company, the most gratifying thing is that from the original manual conveying to the screw conveyor conveying, labor-saving and labor-saving, greatly improving the work efficiency, in this skills competition has achieved excellent results.

Key words: