At 2: 00 p.m. on November 27, the first meeting of the acceptance committee for the start-up of the cogeneration reconstruction and expansion project of Leling Leyuan Thermal Power Co., Ltd. was held in the conference room on the first floor. The meeting was presided over by Liu Gang, general manager of Leyuan Thermal Power and vice chairman of the start-up acceptance committee. The purpose of this meeting is to review the preparation of the whole unit start-up of the test run headquarters before the boiler ignition start-up test run, coordinate the external conditions of the whole unit start-up, and determine the start-up time of the whole unit and other related matters. Liu Zong briefly introduced the progress of the project, which started from the boiler installation on December 29, 2014 to the present.

图片

At 2: 00 p.m. on November 27, the first meeting of the acceptance committee for the start-up of the cogeneration reconstruction and expansion project of Leling Leyuan Thermal Power Co., Ltd. was held in the conference room on the first floor. The meeting was presided over by Liu Gang, general manager of Leyuan Thermal Power and vice chairman of the start-up acceptance committee.


The purpose of this meeting is to review the preparation of the whole unit start-up of the test run headquarters before the boiler ignition start-up test run, coordinate the external conditions of the whole unit start-up, and determine the start-up time of the whole unit and other related matters.


Mr. Liu briefly introduced the progress of the project. The project has experienced 11 months of installation period from the beginning of boiler installation on December 29, 2014 to the present, and has ushered in the trial operation stage with basic conditions.
Liu Xudong, commander-in-chief of the start-up acceptance Committee and the trial operation headquarters, Wang Xiaoqiang, deputy commander-in-chief, Zhang Hongshan, deputy commander-in-chief, head of the trial operation team of the division, Zhang Shengli, head of the whole trial operation team, Ma Changchun, supervisor, and Chen Yanjun, representative of the design institute, made speeches respectively.


Commander-in-chief Liu Xudong pointed out that the convening of the first meeting of the start-up acceptance committee for the cogeneration reconstruction and expansion project means that the 5# furnace and the 6# machine have officially entered the commissioning start-up procedure from today. According to Deere's installation schedule, the commissioning has been partially completed by November 30 and the ignition conditions are available. The purging work after ignition of the furnace will be completed within 5 days, and the defect will be eliminated in 2 days. The furnace will be put into trial operation on December 7, striving for one-time ignition success.
Deputy Commander-in-Chief Wang Xiaoqiang proposed to set up a special rectification team (defect elimination team) to ensure that the problems encountered in debugging are solved in the first place and the one-time ignition is successful. He also requested that all records in the debugging phase be collected and handed over to Party A (Leyuan Thermal Power Co., Ltd.) as first-hand information.
Each commissioning team leader reported the completion of the project and the completion of the installation.



Supervisor Ma Changchun pointed out that as a supervisor, in line with the principles of fairness and justice, with quality and credibility as the main purpose, after issuing several commissioning plans, it has basically entered the interlocking commissioning stage. At present, there is no major aspect affecting the start-up of the system, mainly because the wiring between DCS and Deere has not been completed and the remote control part has not been achieved, at the same time, the basic work of the smoke and air system, water production system, oil system, coal feed system and deoxygenation water supply system has been completed, but it is really necessary to work overtime to reach the standby level. Each system must have personnel on duty. Starting from today, there will be 24-hour intermittent shift commissioning to ensure the normal start of the furnace on November 30.


Chen Yanjun, a representative of the design institute, evaluated and expounded the engineering quality from the engineering design overview, design guiding ideology and working principles, main design features of the project and from the design point of view, and ensured that the design work conforms to the relevant national norms and regulations.
Pan Yongsheng, chairman and deputy general manager of the group, finally announced that the Leyuan cogeneration reconstruction and expansion project had reached the start-up conditions and started as planned.


At the same time, it is pointed out that in the start-up process, it is emphasized that all work should focus on the start-up, focus on mutual coordination and cooperation, strictly prohibit mutual prevarication, and strict work discipline. In this regard, it is not right for people, regardless of the installation unit, equipment manufacturer, or commissioning Personnel, as well as all units and departments participating in the project start-up, must focus on work, and hope that the power plant will put safety first and strengthen management in this aspect. At the same time, the power plant is required to arrange accommodation for the staff of all units and equipment manufacturers participating in the start-up, and to live in the plant as far as possible. All the staff of the power plant who participate in the commissioning will be on duty 24 hours a day from now on. They have no know-how to work, but are serious, active and cooperative. To set up a sudden repair team, there must be unforeseen problems. This start-up is a major event that our group company is looking forward to. All the personnel participating in the start-up should do their best, and the company will give special affairs to special cases.
In the end, Pan always wished the whole set of reconstruction and expansion project a smooth start-up and trial operation!