Shandong Xingguang Capital Biotechnology Co., Ltd. Annual Output of 50000 Tons of Functional Sugar (Alcohol) Project Environmental Impact Assessment Second Publicity
Release time:
2021-11-25
Brief Description of 1. Works
Project Name:Annual production510,000 tons of functional sugar (alcohol) project
Nature of Project:New
Construction unit: Shandong Xingguang Capital Biotechnology Co., Ltd.
Construction site:Economic and Technological Development Zone, Leling City, Dezhou City, Shandong Province (North of Jinjin East Road)
Total investment:30486Ten thousand yuan
Project content:It is planned to build a production workshop and its supporting facilities, and the main raw materials of the products are: glucose, maltose syrup, etc. Production process: fermentation, biological enzyme reaction, decolorization, desalination, concentration, drying, etc. After completion, it can be processed to produce galacto-oligosaccharides10000tons/year, isomaltooligosaccharide 10000tons/year, edible erythritol 30000tons/year
Land nature and land area: total land area60340m2(90.51mu).
2. the pollution of the project and its possible impact on the environment
1. Exhaust gas:organized particulate matterDischarge concentration meetsIntegrated Emission Standard for Regional Air Pollutants (DB37/2376-2019)requirements,VOCSThe emission concentration and emission rate meet the requirements of VOC Emission Standard No.7Part:OtherIndustry (DB37/2801.7-2019) Medium Table1Requirements.The unorganized emission source of the project is"Run, run, drip, leak"Exhaust gas can be discharged up to the standard at the factory boundary.
2Wastewater:Wastewater discharged from the project can meet the requirements of sewageInlet water quality requirements for treatment station. The project wastewater is not directly discharged into the surface water body, which has little impact on the surrounding environment.
3. Solid waste The solid waste of the proposed project shall be reasonably disposed or treated after classified collection and reasonable temporary storage, and shall not be discharged to the environment, which conforms to the disposal principles of "harmlessness", "reduction" and "resource utilization" of solid waste,Will not affect the external environment.
4. Noise:After the project takes shock absorption, noise elimination and sound insulation measures for each noise source, the noise at the boundary of the factory meets the "Environmental Noise Emission Standard for Industrial Enterprises at the Boundary" (GB12348-2008) Medium 2Classstandard requirements.
5. Environmental risk: this project does not involve major risk sources, and risk prevention measures such as accident pools are built in the project area, which will not have a great impact on the surrounding environment.
Key Points of 3. Environmental Impact Assessment Conclusions Proposed in the Environmental Impact Report
1. This project is in line with the national industrial policy;
2. The project has taken limited prevention and control measures for the pollutants generated in its production process, which can meet the discharge standards;
3. The pollution control process adopted in this project is reasonable, the total amount of pollutants produced has been greatly reduced, and the emission is small;
4. After the completion of the project, the current situation of regional environmental quality will not be changed.
4. the manner and duration of public access to environmental impact reports
The public can check the simplified version of the evaluation report at Shandong Xingguang Capital Biotechnology Co., Ltd. within ten working days from the date of this announcement. For further additional information, contact the construction unit or evaluation unit by telephone or email.
Scope and Main Matters of the 5. for Public Comments
The main purpose of this announcement is to understand the public's perception of the main environmental factors that affect the lives of residents, such as ambient air quality, surface water, groundwater, noise and environmental risks in the evaluation area, and the impact of the project on the local economic development after the project is completed and put into operation. Attitudes towards the impact of residents' lives and whether they agree with the construction site of the project.
Name and contact information of 6. construction unit
Construction unit:Shandong Xingguang Capital Biotechnology Co., Ltd.
Address: Economic and Technological Development Zone, Leling City, Dezhou City, Shandong Province (North of Jinjin East Road)
Contact: Minister Zhou Telephone:15315888354
Mailbox:xiangmubu@sdxgty.com
7.Name and contact information of EIA unit
Environmental Impact Assessment Unit: Shandong Environmental Protection Science Research and Design Institute Co., Ltd.
Address: Lishan Road, Lixia District, Jinan City, Shandong Province50No.
Contact: Guo Gong Telephone:13791088976
Mailbox:285514599@qq.com
8.Starting and ending time for public comments
PublicCanFrom the date of publicity of this project10a jobWithin days, put forward valuable opinions to the construction unit.
Annex to the project EIA report2:http://www.sdxgty.com/companyfile/31.html
See Annex for the Form of Public Comments3:http://www.sdxgty.com/companyfile/30.html
Shandong Xingguang Capital Biotechnology Co., Ltd.
2021Year11Month25Day
Key words:
Recommended News
Starlight
E-Mail:1358821373@qq.com
Address: Xingguang Food (International) Industrial Park, Xingguang Avenue, Economic Development Zone, Leling City, Dezhou City, Shandong Province