Leyuan Thermal Power of Leling City Completed Cleaner Production Audit


Release time:

2022-02-16

Leling Leyuan Thermal Power Co., Ltd. Cleaner Production Audit Proposes Cleaner Production Plan11, including 8 low-cost schemes and 3 medium-high-cost schemes,

Evaluation periodThe 8 no/low cost schemes have been fully implemented. The 8 no/low cost schemes have a total investment of 1 million yuan, saving 2027t/a of coal, 4380t/a of water, 4.08 million kWh/year of more power generation, 2.0405 million kWh/year of electricity, 20t/a of oil, 80t/a of ammonia water, 970t/a of steam, 0.97t/a of nitrogen oxide and 0.33t/a of sulfur dioxide, the emission reduction of soot is 0.05t/a, and the economic benefit is 8.835 million yuan/year.

Completed ImplementationThe investment of the three medium/high-cost schemes is 20.18 million yuan, with economic benefits of 11.7496 million yuan/year, coal saving of 1980 tons/year, fuel saving of 20 tons/year, steam saving of 970 tons/year, nitrogen oxide emission reduction of 0.95t/a, sulfur dioxide emission reduction of 0.32t/a, and soot emission reduction of 0.04t/a, thus increasing the operation time and disposal capacity of the system and realizing the increase of environmental benefits.

Through the implementation of clean production environmental benefits, economic increase significantly. Achieving the purpose of energy saving, consumption reduction, pollution reduction and efficiency in clean production.

Key words: